BACnet System – Building Management and Control

Renovations

Projects: Prev Next

BACnet System – Building Management and Control

Location Client Size Role Duration
1400 S. Lake Shore Drive, Chicago, IL 60605 The Field Museum of Chicago The Field Museum Space Project Manager 2003 – 2006

An on-going project of improving the use of energy throughout the Field Museum of Chicago using the latest in automated control systems. This system integrates the continuous mechanical, electrical and plumbing upgrades with a central automated control system that is able to communicate with and control these systems no matter who manufactured them. This gives the museum a more efficient way to control multiple systems. “BACnet” eliminates the need for additional sensors and increases the response time to climatic changes inside the museum.