Renovations
51st to 54th Street Reconstruction
| Location | Client | Role | Duration |
|---|---|---|---|
| 5100 South Lake Shore Drive | City of Chicago, Dept. of Environment / Chicago Park District | ... | July 2001 |
Stabilization of the shoreline with a reinforced concrete promenade (25' wide), reinforced concrete steps and reinforced concrete wave deflector at the top.
Included extending the shoreline approximately 100 feet out into the lake using approved compacted slag for lake fill behind steel sheet piling for the new 25 feet wide promenade deck, etc., backfill behind the steps & wave deflector, soil over backfill, landscaped with grass and trees.
The project also included the construction of a new asphalt bike path with lane markings and soft fine gravel shoulders for joggers.
Project Scope
Sub consultant / on-site inspection / quality assurance by Harza Engineering Company / CATH Associates, Inc.